Home Taffrail PortlightsPrevious | NextSteering 2
03 / 01 / 00 I decided that kerfing or laminating would not produce the best looking taffrail.  I came up with a method of steam bending that would allow me to get a sufficient bend without having to build a steam box and all the other paraphernalia. 

Here the piece is drying to the form which was made a little higher than needed with some 2x4s.

03 / 03 / 00 The blocks were screwed from underneath (one reason I put the taffrail on before I did the seats).  The piece was routed and formed in place after it was permanently attached.
03 / 03 / 00 The rail was made from a piece of 3/4" x 2" (finished) mahogany to match the side rails.  Without applying the wet heat it surely would have snapped since there was quite a bit of grain run out on this piece.