Home Dryfitting TapingPrevious | NextSides
07 / 22 / 99 Dryfitting the bulkheads and deck. 

Notice the mast box and cabin box were added to the bulkheads during dryfitting so that these parts would mantain their proper angles a positions.

07 / 22 / 99 This step was used to sand the bottom and deck so that the sides would fit.
07 / 22 / 99 During this process the sides were being scarfed, epoxied and glassed.